HT/LT Electrical Infrastructure
Complete industrial & commercial power distribution: armoured XLPE cabling, cable trays, busducts, rising mains, and internal electrification.
View Detailed E1 Scope →Turnkey HT/LT electrical contracting, custom LT switchboards, distribution transformers, IS 3043 earthing, MSEDCL/CEIG statutory liaison, preventive AMC, and solar electrical BoS.
Complete industrial & commercial power distribution: armoured XLPE cabling, cable trays, busducts, rising mains, and internal electrification.
View Detailed E1 Scope →Fabrication, supply, erection, and commissioning of PCC, MCC, AMF, SDB, and detuned APFC capacitor panels conforming to IS 8623 / IEC 61439.
View Detailed E2 Scope →100–2500 kVA transformer installation, oil filtration/BDV testing, IS 3043 chemical & copper plate earthing, and IS/IEC 62305 lightning protection.
View Detailed E3 Scope →New HT/LT load sanctions, contract demand enhancements, CEI drawing submissions, Form A test dossiers, and charging permissions in Maharashtra.
View Detailed E4 Scope →Structured electrical AMCs, shutdown maintenance, IR thermography, ACB/VCB servicing, earth resistance audits, and safety compliance support.
View Detailed E5 Scope →AC/DC balance-of-system execution, Solar ACDB/LT evacuation panels, DG-PV sync wiring, bi-directional metering, and Solar CEIG approvals.
View Detailed E6 Scope →Choose the commercial and execution model aligned with your internal procurement and engineering team.
| Engagement Model | Primary Scope Included | Best Suited For | Key Cost / Scope Drivers |
|---|---|---|---|
| Turnkey Electrical EPC | Material supply (ISI/branded) + licensed installation + testing + statutory handover | New MIDC factories, commercial buildings, substation upgrades | kVA capacity, cable run lengths, copper vs. aluminium busbar, switchgear make |
| Labour + Licensed Supervision | Skilled electricians, CEI supervisor oversight, tools, testing & Form A certification | Clients supplying free-issue cables, panels, and transformers | Man-days, shift/height working conditions, shutdown window constraints |
| Annual Maintenance Contract (AMC) | Scheduled monthly/quarterly inspections, annual shutdown, thermography & reports | Operational factories, IT parks, hospitals, warehouses | Asset count (transformers, breakers, panels), response SLA, consumables |
| Statutory Liaison Package | SLD preparation, MSEDCL portal filing, CEIG drawing & inspection coordination | Load enhancement, new HT/LT connections, solar charging approvals | Voltage level (LT/11kV/22kV/33kV), statutory fees (at actuals), site readiness |
| Solar BoS Execution | AC/DC cabling, ACDB, earthing/LPS, DG-PV sync & bi-directional meter installation | Solar EPCs (incl. ROOFITPV) and C&I solar asset owners | Plant kWp/MWp, evacuation voltage, roof-to-PCC distance, CEIG applicability |