STEP 01
Site Survey / BOQ Intake
Physical inspection, load verification, and review of SLD, layouts, or tender BOQ.
STEP 02
Technical Estimation
Cable sizing, switchgear selection, IS/IEC code alignment, and statutory requirement mapping.
STEP 03
Commercial Proposal
Itemized BOQ quotation, approved make list, milestone schedule, and clear exclusions.
STEP 04
Material Procurement
Sourcing ISI-marked cables, branded switchgear, and factory-tested LT panels with MTCs.
STEP 05
Licensed Site Execution
Supervised installation under PPE, LOTO, and CEA 2023 site safety protocols.
STEP 06
Testing & Pre-Commissioning
Megger IR, earth resistance, oil BDV, relay injection, and phase-sequence verification.
STEP 07
CEIG / MSEDCL Charging
Form A submission, Chief Electrical Inspector site audit, and utility energization approval.
STEP 08
Handover & AMC
As-built SLD dossier, test reports handover, and optional preventive AMC onboarding.