ILLUSTRATIVE EXECUTION SCOPE · REPRESENTATIVE PROJECT FRAMEWORK · AE-06
Commercial Building Internal & Rising Main Electrification
Representative framework for multi-storey commercial building electrification covering meter room busbars, vertical rising mains, floor tap-off distribution, and fire-rated emergency circuits.
Framework Disclosure:
AE-06 is published as an Illustrative Execution Scope / Representative Project Framework detailing AAROHAN ELECTRICALS' standardized execution sequence, applicable IS/IEC standards, and handover deliverables.
Division E1 · Commercial EPC
Technical Framework Parameters
| Distribution Architecture | 400A–800A Rising Main Busbar Trunking |
| Wiring Standard | IS 732, FRLS / ZHFR Copper Conductors |
| Safety Protection | 30mA/100mA RCCB / RCBO per Floor DB |
| Fire Safety | Fire-Barrier Shaft Sealing & Dedicated Fire Pump Feeder |
EXECUTION & TESTING DELIVERABLES
Standardized Site Execution Sequence
- Meter cabin layout compliant with MSEDCL clearances & ventilation norms
- Vertical rising main installation with thrust bearings, fire barriers & floor tap-off boxes
- Floor Sub-Distribution Boards (SDBs) with phase balancing & residual current protection
- Dedicated armoured feeders for lifts, fire-fighting pumps, HVAC chillers & basement lighting
- Complete circuit scheduling, insulation testing & Form A statutory certification