INTEGRATED ENERGY ECOSYSTEM:

Representative Project Frameworks (AE-01 to AE-12)

Standardized technical scopes illustrating our execution methodology, IS/IEC compliance standards, testing protocols, and handover deliverables across 12 industrial and commercial workstreams.

Transparency Notice: Every entry below (AE-01 through AE-12) is explicitly presented as an Illustrative Execution Scope / Representative Project Framework to demonstrate AAROHAN ELECTRICALS' engineering standards and deliverables. They do not represent fabricated client testimonials or confidential third-party endorsements.
ILLUSTRATIVE EXECUTION SCOPE · AE-01 E1 · HT/LT Infrastructure

Industrial LT Distribution & Busbar Upgrade

800A–1600A feeder rehabilitation, XLPE cabling & fault-rated switchgear.

View AE-01 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-02 E3 · Transformers & Earthing

250 kVA Transformer Installation & Commissioning

11kV/433V ONAN transformer plinth erection, protection & BDV testing.

View AE-02 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-03 E2 · LT Panels

PCC & MCC Panel Fabrication & Installation

IS 8623 compartmentalized IP54 switchboards with ACB/MCCB & motor starters.

View AE-03 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-04 E2 · Power Quality

APFC Capacitor Bank & Harmonic Detuning Upgrade

Automatic detuned APFC (7% reactor) targeting >0.98 lag PF & zero penalty.

View AE-04 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-05 E3 · Earthing & Safety

Chemical & Copper Plate Earthing Grid (IS 3043)

Multi-pit interconnected neutral & body earthing grid with test links.

View AE-05 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-06 E1 · Commercial EPC

Commercial Building Internal & Rising Main Electrification

Multi-floor rising main busbar, tap-off boxes & meter room compliance.

View AE-06 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-07 E4 · Statutory Liaison

MSEDCL HT Load Sanction & CEIG Charging Approval

HT contract demand enhancement, CEI drawing approval & charging dossier.

View AE-07 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-08 E5 · Preventive Maintenance

Transformer Oil Filtration, BDV & Routine Testing

On-site vacuum dehydration filtration, BDV restoration & silica gel renewal.

View AE-08 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-09 E6 · Solar Electrical BoS

Solar AC/DC Evacuation & Bi-Directional Metering BoS

Solar ACDB, anti-islanding evacuation, dedicated earthing & net metering.

View AE-09 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-10 E5 · Industrial AMC

Factory Preventive Maintenance & Thermography AMC

Scheduled shutdown servicing, IR hotspot scanning & breaker testing.

View AE-10 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-11 E1 / E3 · Logistics

Warehouse High-Bay Lighting & Surge Protection

Uniform high-bay LED distribution, Type 1+2 SPDs & IS/IEC 62305 LPS.

View AE-11 Technical Framework →
ILLUSTRATIVE EXECUTION SCOPE · AE-12 E2 · Backup Power

DG Synchronization & AMF Panel Integration

Auto Mains Failure (AMF) & multi-DG load sharing synchronization wiring.

View AE-12 Technical Framework →
⚡ Site Survey 💬 WhatsApp Call / Quote →