INTEGRATED ENERGY ECOSYSTEM:
EARTHING & LPS · 6 MIN READ

Lightning Protection Systems (IS/IEC 62305) for Industrial Sheds

Protecting PEB factories, warehouses, and rooftop solar arrays using rolling-sphere risk assessment, air terminals, down-conductors, equipotential bonding, and Type 1+2 SPDs.

Why Metal PEB Sheds Still Require Engineered LPS

Pre-Engineered Building (PEB) warehouses and industrial sheds—especially those fitted with rooftop solar PV arrays—present large elevated metallic footprints during Maharashtra's pre-monsoon and monsoon lightning storms. Relying on thin roofing sheets (0.45–0.55 mm) risks puncture, fire ignition, and destructive surge currents entering the plant's PLC/VFD network.

Four Pillars of IS/IEC 62305 Compliance

  1. Air Termination Network: Positioned via the Rolling Sphere / Protective Angle method so lightning strikes are safely intercepted above roof ridges, exhaust fans, and solar modules.
  2. Dedicated Down-Conductors: Multiple symmetric paths routed along external perimeter columns with test clamps at 1.5 m height.
  3. Dedicated LPS Earth Pits & Bonding: Independent low-resistance earth electrodes interconnected at ground level to maintain equipotential bonding and prevent dangerous side-flashes.
  4. Coordinated Surge Protection (SPDs): Type 1+2 SPDs at the Main PCC incomer and Type 2 SPDs at Solar ACDB/DCDB and critical server/automation boards.
Ecosystem Analytical Deep-Dive: Integrating rooftop solar onto an industrial shed? Coordinate PV array EPC with ROOFITPV Solar EPC ↗ and electrical BoS/LPS with AAROHAN ELECTRICALS.
NEED LICENSED EXECUTION IN MAHARASHTRA?

Apply These Standards on Your Facility

AAROHAN ELECTRICALS executes IS/IEC and CEA 2023 compliant electrical contracting across Badlapur, Ambernath, Thane, Navi Mumbai, MMR, Pune, and Maharashtra MIDC zones.

Request Site Survey → Explore E3 · Earthing & LPS Open Readiness Checklists