8-Step Licensed Execution & Handover Workflow
From initial BOQ intake and physical site survey through material verification, supervised installation, pre-commissioning testing, and CEIG/MSEDCL charging.
01. Site Survey & BOQ / SLD Intake
We inspect physical cable routes, electrical room clearances, existing earthing condition, and transformer plinths—or audit your tender BOQ and SLD.
- Physical measurement & load verification
- Identification of CEA 2023 clearance gaps
- Optional pre-study routing to WATTPVFY for ETAP/bill audits
02. Technical Estimation & Code Alignment
Every item is sized for thermal current capacity, voltage drop (<3%–5%), short-circuit withstand, and applicable IS/IEC standards.
- Cable derating for grouping & ambient temperature
- Switchgear fault level & selectivity check
- MSEDCL / CEIG statutory pathway mapping
03. Transparent Commercial Proposal
Itemized BOQ quotation specifying exact approved makes, technical datasheets, execution timeline, and statutory fee clarity.
- Zero hidden exclusions or vague lump sums
- Clear milestone-linked billing schedule
- GST-compliant commercial documentation
04. Material Procurement & Factory Inspection
Procurement of ISI-marked cables, branded switchgear, and type-tested LT panels backed by Manufacturer Test Certificates (MTCs).
- Pre-dispatch panel inspection & HV test check
- Serial-numbered material delivery records
- Safe on-site storage & drum handling
05. Licensed Site Execution & Supervision
Work executed by qualified electricians under Maharashtra CEI-licensed Electrical Supervisor oversight with mandatory PPE and LOTO.
- Clean glanding, crimping, ferruling & dressing
- Torque-marked busbar & lug terminations
- Daily progress logs & safety toolbox talks
06. Testing & Pre-Commissioning
Comprehensive verification using calibrated instruments before any circuit or transformer is energized.
- Megger IR (500V/1kV/5kV) & continuity tests
- Earth pit resistance (IS 3043) & oil BDV tests
- Breaker trip, relay interlock & phase sequence
07. CEIG & MSEDCL Charging Approval
Submission of signed Form A completion reports, test dossiers, and coordination during Chief Electrical Inspector / utility inspection.
- Compliance closure of inspection observations
- Official charging permission & energization
- Utility meter sealing & synchronization
08. As-Built Handover & Preventive AMC
Structured handover of as-built SLDs, test certificates, warranty cards, and optional onboarding into our preventive AMC program.
- Complete physical & digital handover dossier
- Operator orientation on panel & safety LOTO
- Optional quarterly/annual AMC scheduling