INTEGRATED ENERGY ECOSYSTEM:

8-Step Licensed Execution & Handover Workflow

From initial BOQ intake and physical site survey through material verification, supervised installation, pre-commissioning testing, and CEIG/MSEDCL charging.

STAGE 01 · INTAKE

01. Site Survey & BOQ / SLD Intake

We inspect physical cable routes, electrical room clearances, existing earthing condition, and transformer plinths—or audit your tender BOQ and SLD.

  • Physical measurement & load verification
  • Identification of CEA 2023 clearance gaps
  • Optional pre-study routing to WATTPVFY for ETAP/bill audits
STAGE 02 · ENGINEERING

02. Technical Estimation & Code Alignment

Every item is sized for thermal current capacity, voltage drop (<3%–5%), short-circuit withstand, and applicable IS/IEC standards.

  • Cable derating for grouping & ambient temperature
  • Switchgear fault level & selectivity check
  • MSEDCL / CEIG statutory pathway mapping
STAGE 03 · COMMERCIAL

03. Transparent Commercial Proposal

Itemized BOQ quotation specifying exact approved makes, technical datasheets, execution timeline, and statutory fee clarity.

  • Zero hidden exclusions or vague lump sums
  • Clear milestone-linked billing schedule
  • GST-compliant commercial documentation
STAGE 04 · PROCUREMENT

04. Material Procurement & Factory Inspection

Procurement of ISI-marked cables, branded switchgear, and type-tested LT panels backed by Manufacturer Test Certificates (MTCs).

  • Pre-dispatch panel inspection & HV test check
  • Serial-numbered material delivery records
  • Safe on-site storage & drum handling
STAGE 05 · EXECUTION

05. Licensed Site Execution & Supervision

Work executed by qualified electricians under Maharashtra CEI-licensed Electrical Supervisor oversight with mandatory PPE and LOTO.

  • Clean glanding, crimping, ferruling & dressing
  • Torque-marked busbar & lug terminations
  • Daily progress logs & safety toolbox talks
STAGE 06 · TESTING

06. Testing & Pre-Commissioning

Comprehensive verification using calibrated instruments before any circuit or transformer is energized.

  • Megger IR (500V/1kV/5kV) & continuity tests
  • Earth pit resistance (IS 3043) & oil BDV tests
  • Breaker trip, relay interlock & phase sequence
STAGE 07 · STATUTORY

07. CEIG & MSEDCL Charging Approval

Submission of signed Form A completion reports, test dossiers, and coordination during Chief Electrical Inspector / utility inspection.

  • Compliance closure of inspection observations
  • Official charging permission & energization
  • Utility meter sealing & synchronization
STAGE 08 · LIFECYCLE

08. As-Built Handover & Preventive AMC

Structured handover of as-built SLDs, test certificates, warranty cards, and optional onboarding into our preventive AMC program.

  • Complete physical & digital handover dossier
  • Operator orientation on panel & safety LOTO
  • Optional quarterly/annual AMC scheduling